SIMVBSE GAME EVOLUTION ANALYSIS
Project Information
 
Academic Period
CS577a Fall 2006
Project Domain
Other (Game Evolution Analysis)
Project Name
SIMVBSE Game Evolution Analysis
Project Type
Research based
Team Number
05
Client

Apurva Jain
Research Assistant
Center for System and Software Engineering, USC

Developers

Arpitha Shetty
Project Manager

Neha Sethi
Logistics

Bhavin Doshi
System Analyst

Sapan Parekh
Business Analyst

Sneha Matani
Business Analyst

Anuj Walia
System Analyst

Bradford Loos
IV & V

Ryan McAlinden
IV & V

COTS
Not Applicable
Links
SimVBSE Game
ReadMe for Website Configuration
 
Project Description
The Center for Software Engineering at USC requires an analysis for the evolution of its current version of the VBSE game. The proposed plan will provide research analysis and speculative information such as resources, time and effort required on how to evolve the game in future. It will give the core team and the client a better understanding of the game thereby reducing the time in analysis for future development.
 
Life Cycle Objectives [LCO]
Artifact Name Early OCD Initial Reports LCO Core LCO Draft LCO Package
Operational Concept Description

Before      
After     
QR

           QR   
WinWin Report             
Prototype Report   CEP   
TEP   
QR  
     
Market Trend Analysis              QR       QR
Game Engine Evaluation Sheet             
Capability Evolution Plan              QR        QR
Technical Evolution Plan             
Life Cycle Plan               QR
MS Project Plan      
Feasibility Rationale Description            
Supporting Information Document           
LCO ARB Presentation         T05   IV&V
 
Life Cycle Architecture [LCA]
Artifact Name LCA Draft LCA Package
Easy Win Win Report Updated   
Review of Easy WinWin Evaluation -
Operational Concept Description      
Market Trend Analysis       QR       QR
Game Engine Evaluation Sheet
Capability Evolution Plan       QR       QR
Technical Evolution Plan      
Life Cycle Plan       QR       QR
MS Project Plan
Feasibility Rationale Description      
Supporting Information Document      
LCA ARB Presentation   T05   IV&V
 
Weekly Progress Reports
Week Project Plan Progress Reort
Week 1
Week 2
Week 3
Week 4
Week 5
Week 6
Week 7
Week 8
Week 9
Week 10
Week 11
Week 12
 
Client Meeting Notes
Note # (Date) File
Note 1 (09/05/2006)
Note 2 (09/15/2006)
Note 3 (09/26/2006)
Note 4 (10/03/2006)
Note 5 (10/09/2006)
Note 6 (10/16/2006)
Note 7 (10/21/2006)
Note 8 (10/27/2006)
Note 9 (11/13/2006)
 
IV & V Evaluations
Artifact Name (Evaluations By...) Bradford Loos (IV&V a) Ryan McAlinden (IV&V b)
Early OCD          Checklist
WinWin Negotiations Report Evaluation
Prototype Evaluation
EasyWinWin Report Evaluation
LCO Core Evaluation & Concern Log        
Problem List & Explanation Log for LCO Core        
LCO Draft Evaluation & Concern Log Not submitted    
Problem List & Explanation Log for LCO Draft -    
LCO Package Evaluation & Concern Log Not submitted    
Problem List & Explanation Log for LCO Package -    
QMP - II Not submitted    
LCA Draft Evaluation & Concern Log Not submitted    
Problem List & Explanation Log for LCA Draft -    
LCA Package Evaluation & Concern Log Not submitted    
Updated EasyWinWin Report Evaluation Not submitted
Last Updated on: December 11, 2006 @ 12:00 AM