| Date |
Lecture |
Speakers |
Individual Assignments |
Team Assignments
(On Campus) |
Team Assignments
(Off Campus) |
Tutorials |
Readings |
M
8/25 |
Course Overview, VBSE,
Risk |
Boehm |
EF-1; EF-2 |
|
|
|
EC-01 |
EP-01
EP-02 |
W
8/27 |
VBSE II, MBASE / ICM |
Boehm |
PC-1 |
|
|
|
EC-02 |
EP-04
EP-05
EP-06
EP-07 |
F
8/29 |
ICM for CSCI577 |
Brown |
EF-3; EF-4 |
|
|
|
EC-03a
EC-03b |
| EP-23 |
M
9/01 |
Labor Day - No Class |
W
9/03 |
Stakeholder Win Conditions,
Wiki Win-Win |
Boehm, Wu |
HW-1 |
Team Mixer |
|
COCOMO
+
MS Project
|
EC-04 |
EP-08
EP-09
EP-10 |
F
9/05 |
COTS Based Systems |
Boehm, Aroonva |
HW-2 |
|
|
EC-05 |
EP-11
EP-12 |
M
9/08 |
Simplifiers and Complicators
and MBASE & DEN Roles |
Boehm, Brown |
PC-2 |
Team Finalization |
|
WikiWinWin1
(DW)
|
EC-06 |
| EP-13 |
T
9/09 |
|
EF-5:
Teams Formed |
Meet with Clients |
EF-6: DEN Project Selection |
|
W
9/10 |
OCD, Risk Analysis |
Boehm |
PC-3 |
|
|
EC-07 |
| EP-14 |
Th
9/11 |
|
|
|
F
9/12 |
Client Interaction |
Majchrzak |
HW-3 |
|
|
EC-08 |
| |
M
9/15 |
Requirements |
Colbert |
ER; PC-4 |
|
|
WikiWinWin2
(DW)
|
EC-09a EC-09b |
| EP-15 |
W
9/17 |
DART,
Prototyping: UI, Security and other risks |
Brown |
|
1) PR
2) MS Project 3) DART |
Client Interaction Report |
|
EC-10 EC-10a EC-10b EC-10c |
| |
F
9/19 |
Cost Estimation, Business
Case |
Boehm |
PC-5 |
|
|
EC-11 |
| |
M
9/22 |
Quality Management I; Peer Reviews I |
Brown |
ER; Evaluation of ICM EPG (DEN students only); Post-Class 4 |
VC Package |
WikiWinWin Negotiations |
|
RSM
(EC) |
EC-12a EC-12b EC-12c
|
| |
W
9/24 |
OOA&D I |
Colbert |
PC-6 |
1) PR
2) MS Project 3) DART |
|
EC-13a
EC-13b |
EP-16
EP-20 |
F
9/26 |
LCP: Planning & Control |
Boehm |
PC-7 |
|
|
EC-14 |
EP-17
EP-18
EP-19 |
M
9/29 |
OOA&D II |
Colbert |
ER; HW-4 |
Initial Prototype |
Evaluation of VC Package
|
|
|
EP-20
EP-25
EP-26 |
W
10/01 |
Feasibility Evidence Description
|
Boehm |
PC-8 |
1) PR
2) MS Project 3) DART |
|
|
EC-16 |
| EP-21 |
F
10/03 |
Quality/Configuration Management |
Brown
|
|
|
|
|
|
| |
| |
M
10/06 |
OOA&D III |
Colbert |
ER |
Core FC Package |
Evaluation of initial Prototype |
|
|
| |
W
10/08 |
User Interface |
Brown |
HW-5 |
1) PR
2) MS Project 3) DART |
WWW Report
|
|
|
| |
F
10/10 |
OOA&D Workshop |
Colbert |
|
System Analysis Model |
|
|
|
| |
M
10/13 |
Agile Concepts I |
Boehm |
ER |
Draft FC Package |
Evaluation of Core FC Package
|
|
EC-20 |
| |
W
10/15 |
Agile Concepts II |
Boehm |
|
1) PR
2) MS Project 3) DART |
|
|
EC-21 EC-21b |
| |
F
10/17 |
Past Experiences, FCR Workshop |
Boehm |
HW-6 |
Response to Evaluation of Core FC Package |
|
|
EC-22 |
| |
M
10/20 |
FCR ARBs |
ER |
|
Evaluation of Draft FC Package
|
|
|
| |
W
10/22 |
FCR ARBs |
|
1) PR
2) MS Project 3) DART |
|
|
|
| |
F
10/24 |
FCR ARBs |
|
|
|
|
|
| |
M
10/27 |
FC Package Q&A
iStudio & COTS |
Koolman,
Aroonva |
ER |
FC Package |
QMP #1 |
|
EC-23 |
| |
W
10/29 |
OOA&D IV, DCR SSAD |
Colbert |
|
1) PR
2) MS Project 3) DART
4) Response to Eval. of Draft PC Package |
|
|
EC-24 |
| |
F
10/31 |
ARB Feedbacks and Looking Forward Into Development |
Brown |
Mid-Sem Evaluation |
|
|
|
EC-25a
EC-25b |
| |
M
11/03 |
Future of Software Engineering |
Boehm |
ER |
COTS Pre-Assignment Survey |
Evaluation of FC Package
|
|
EC-26 |
| |
W
11/05 |
SW Transition and Support |
Boehm |
|
1) PR
2) MS Project 3) DART |
|
|
EC-27 |
| |
F
11/07 |
QMP: QFP, testing, and CM Plans (and DCR expectations) |
Brown |
|
|
|
|
EC-28 |
| |
M
11/10 |
QM: Peer Reviews for Foundations and Construction |
Brown |
ER; PC-9 |
Response to Eval. of FC Package |
|
|
EC-29 |
| |
W
11/12 |
SSAD in DC |
Colbert |
|
1) PR
2) MS Project
3) DART |
|
|
EC-30 |
| |
F
11/14 |
SW Ethics |
Boehm |
|
COTS Integration Analysis |
|
|
EC-31 |
| EP-22 |
M
11/17 |
ICM-Sw and Large Systems |
Brown |
ER |
|
QMP #2 |
|
EC-32 |
| |
W
11/19 |
577: Integrate Education and Research |
Boehm |
HW-7 |
1) PR
2) MS Project 3) DART |
Updated WWW Report
|
|
EC-33 |
| |
F
11/21 |
DCR Architecture Workshop |
Colbert,
Brown |
|
|
|
|
EC-34 |
| |
M
11/24 |
Software Architecture Masterclass |
Booch |
ER |
Draft DC Package |
|
|
EC-35a: (DCR Workshop II) |
| |
W
11/26 |
DCR ARB Workshop |
Brown |
|
1) PR
2) MS Project 3) DART |
|
|
EC-36 |
| |
F
11/28 |
Thanksgiving Holiday - No Class |
M
12/01 |
DCR ARBs |
ER |
|
Evaluation of Draft DC Package
|
|
|
| |
W
12/03 |
DCR ARBs |
|
1) PR
2) MS Project 3) DART |
|
|
|
| |
F
12/05 |
DCR ARBs |
|
|
|
|
|
| |
M
12/08 |
|
ER |
DC Package |
|
|
|
| |
W
12/10 |
|
End-Sem Evaluation |
1) PR
2) MS Project 3) DART
4) Response to Eval. of Draft DC Package |
|
|
|
| |
| F 12/12 |
|
Individual Critique |
|
|
|
|
| |
| M 12/15 |
|
|
|
Evaluation of DC Package
|
|
|
| |