__ _____________ _________________ / / / ____ ___/ / ___ ____ ___/ / / / / /_ / / _____ / / / /_ / /__ / / / /\__ \/ / /____/ / / \__ \/ ___/ / /_/ /___/ / /___ / /_______/ / /___ \____/\____/\____/ \____/\____/\____/ _______________________________________________ / ___ / \ ___ / \ _ _ / \ | | | | / / / __ / / / __ / / \/ / / __ / | | | | / / / /_/ / / / /_/ / / / / /_/ / | | | | / /___/ / /___/ / / / / / | | | | \____/\____/\____/\____/\/ /_/\____/ _|_|_|_|_ ##USC COCOMO II.2000.0## DEVELOPMENT MODEL: Post Architecture Model Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us Scale Factors: PREC FLEX RESL TEAM PMAT N N H VH N 3.72 3.04 2.83 1.10 4.68 NOM ACT RATE Module Effort Effort PROD & INST Module Name Size EAF DEV DEV COST COST Staff RISK SLOC 0.0 Interface to import log data 300 0.84 0.9 0.8 382.1 0 0.0 0.1 0.0 ADAPT 0.0 SQLite Database 825 1.00 2.6 2.6 320.2 0 0.0 0.4 0.0 SLOC 0.0 Log Analysis-relationship 400 1.23 1.2 1.5 259.7 0 0.0 0.2 0.0 SLOC 0.0 Log Analysis-structure tree 500 1.27 1.6 2.0 252.6 0 0.0 0.3 0.0 ADAPT 0.0 Visualization of log analysis 510 1.27 1.6 2.0 252.6 0 0.0 0.3 0.0 TOTAL SLOC 2535 OPTIMISTIC 7.1 356.1 0 0.0 1.1 0.0 MOST LIKELY 8.9 284.9 0 0.0 1.2 0.0 PESSIMISTIC 11.1 227.9 0 0.0 1.4 0.0 OPTIMISTIC MOST LIKELY PESSIMISTIC SCHEDULE 6.8 7.2 7.8 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us MODULE NAME SIZING DETAILS Interface to import REVL INITSLOC SLOC 0 300 SQLite Database REVL INITSLOC DM CM IM SU AA UNFM AT ATPROD ADAPT 0 15000 0 0 5 30.0 4.0 0.4 0 2400.0 Log Analysis-relatio REVL INITSLOC SLOC 0 400 Log Analysis-structu REVL INITSLOC SLOC 0 500 Visualization of log REVL INITSLOC DM CM IM SU AA UNFM AT ATPROD ADAPT 0 5000 5 5 5 30.0 4.0 0.4 0 2400.0 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us PROJECT PHASE & ACTIVITY INFORMATION (Waterfall) =================================================== Overall Phase Distribution ============================================================================== PROJECT Data Mining of DL Us SLOC 2535 TOTAL EFFORT 8.899 Person Months ============================================================================== PCNT EFFORT (PM) PCNT SCHEDULE Staff Plans And Requirements 7.000 0.623 16.178 1.171 0.532 Product Design 17.000 1.513 24.089 1.744 0.868 Programming 63.733 5.672 55.643 4.028 1.408 - Detailed Design 26.911 2.395 ---- ---- ---- - Code and Unit Test 36.822 3.277 ---- ---- ---- Integration and Test 19.267 1.715 20.267 1.467 1.169 ============================================================================== Life Cycle Phase Plans And Requirements Life Cycle Effort 0.623 Person Months Life Cycle Schedule 1.171 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Analysis 47.911 0.298 1.171 0.255 Product Design 16.045 0.100 1.171 0.085 Programming 2.589 0.016 1.171 0.014 Test Planning 2.545 0.016 1.171 0.014 Verification and Validation 6.045 0.038 1.171 0.032 Project Office 15.411 0.096 1.171 0.082 CM/QA 3.455 0.022 1.171 0.018 Manuals 6.000 0.037 1.171 0.032 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us PROJECT PHASE & ACTIVITY INFORMATION (Waterfall) =================================================== ============================================================================== Life Cycle Phase Product Design Life Cycle Effort 1.513 Person Months Life Cycle Schedule 1.744 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Analysis 12.500 0.189 1.744 0.108 Product Design 41.000 0.620 1.744 0.356 Programming 12.045 0.182 1.744 0.104 Test Planning 4.545 0.069 1.744 0.039 Verification and Validation 6.045 0.091 1.744 0.052 Project Office 12.911 0.195 1.744 0.112 CM/QA 2.955 0.045 1.744 0.026 Manuals 8.000 0.121 1.744 0.069 ============================================================================== Life Cycle Phase Programming Life Cycle Effort 5.672 Person Months Life Cycle Schedule 4.028 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Analysis 4.000 0.227 4.028 0.056 Product Design 8.000 0.454 4.028 0.113 Programming 56.500 3.204 4.028 0.796 Test Planning 4.045 0.229 4.028 0.057 Verification and Validation 7.045 0.400 4.028 0.099 Project Office 7.455 0.423 4.028 0.105 CM/QA 6.955 0.394 4.028 0.098 Manuals 6.000 0.340 4.028 0.084 ============================================================================== Life Cycle Phase Integration and Test Life Cycle Effort 1.715 Person Months Life Cycle Schedule 1.467 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Analysis 2.500 0.043 1.467 0.029 Product Design 5.000 0.086 1.467 0.058 Programming 33.178 0.569 1.467 0.388 Test Planning 2.500 0.043 1.467 0.029 Verification and Validation 31.911 0.547 1.467 0.373 Project Office 8.455 0.145 1.467 0.099 CM/QA 8.455 0.145 1.467 0.099 Manuals 8.000 0.137 1.467 0.093 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us PROJECT PHASE & ACTIVITY INFORMATION (MBASE) =================================================== Overall Phase Distribution ============================================================================== PROJECT Data Mining of DL Us SLOC 2535 TOTAL EFFORT 8.899 Person Months ============================================================================== PCNT EFFORT (PM) PCNT SCHEDULE Staff Inception 6.000 0.534 12.500 0.905 0.590 Elaboration 24.000 2.136 37.500 2.715 0.787 Construction 76.000 6.763 62.500 4.524 1.495 Transition 12.000 1.068 12.500 0.905 1.180 ============================================================================== Life Cycle Phase Inception Life Cycle Effort 0.534 Person Months Life Cycle Schedule 0.905 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Capture 38.000 0.203 0.905 0.224 Analysis and Design 19.000 0.101 0.905 0.112 Implementation 8.000 0.043 0.905 0.047 Test 8.000 0.043 0.905 0.047 ============================================================================== Management 14.000 0.075 0.905 0.083 Environment 10.000 0.053 0.905 0.059 Deployment 3.000 0.016 0.905 0.018 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us PROJECT PHASE & ACTIVITY INFORMATION (MBASE) =================================================== ============================================================================== Life Cycle Phase Elaboration Life Cycle Effort 2.136 Person Months Life Cycle Schedule 2.715 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Capture 18.000 0.384 2.715 0.142 Analysis and Design 36.000 0.769 2.715 0.283 Implementation 13.000 0.278 2.715 0.102 Test 10.000 0.214 2.715 0.079 ============================================================================== Management 12.000 0.256 2.715 0.094 Environment 8.000 0.171 2.715 0.063 Deployment 3.000 0.064 2.715 0.024 ============================================================================== Life Cycle Phase Construction Life Cycle Effort 6.763 Person Months Life Cycle Schedule 4.524 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Capture 8.000 0.541 4.524 0.120 Analysis and Design 16.000 1.082 4.524 0.239 Implementation 34.000 2.300 4.524 0.508 Test 24.000 1.623 4.524 0.359 ============================================================================== Management 10.000 0.676 4.524 0.149 Environment 5.000 0.338 4.524 0.075 Deployment 3.000 0.203 4.524 0.045 ============================================================================== Life Cycle Phase Transition Life Cycle Effort 1.068 Person Months Life Cycle Schedule 0.905 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Capture 4.000 0.043 0.905 0.047 Analysis and Design 4.000 0.043 0.905 0.047 Implementation 19.000 0.203 0.905 0.224 Test 24.000 0.256 0.905 0.283 ============================================================================== Management 14.000 0.150 0.905 0.165 Environment 5.000 0.053 0.905 0.059 Deployment 30.000 0.320 0.905 0.354 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us PROJECT MAINTENANCE INFORMATION ============================================= PROJECT Data Mining of DL Us Development SLOC 2535 Development Nominal Person-Month 7.91 Development Adjusted Person-Month 8.90 Development Cost 0.00 Sum of Scale Factors 18.97 PREC FLEX RESL TEAM PMAT Nominal Nominal Nominal Nominal Nominal WORK LOAD PROJECTION FOR THE PROJECT KSLOC Effort_Nom Effort_Maint Staff KSLOC/Staff Cost 2.54 0.00 0.00 0.00 0.00 0.00 SUMMARY OF PROJECTION Cumulative Maintenance Person-month 0.00 Overall Development and Maintenance Person-month 8.90 Cumulative Maintenance Cost 0.00 Overall Development and Maintenance Cost 0.00 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us + Product ++ Platform + MODULE NAME RELY DATA DOCU CPLX RUSE TIME STOR PVOL N H N L L N N H Interface to import 0% 0% 0% 0% 0% 0% 0% 0% 1.00 1.14 1.00 0.87 0.95 1.00 1.00 1.15 + Personnel ++ Project ++ User + MODULE NAME ACAP APEX PCAP PLEX LEXP PCON TOOL SCED SITE USR1 USR2 N H H L H L H N N N N Interface to import 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 1.00 0.88 0.88 1.09 0.91 1.12 0.90 1.00 1.00 1.00 1.00 MODULE PHASE & ACTIVITY INFORMATION (Waterfall) ================================================== Overall Phase Distribution ============================================================================== MODULE Interface to import SLOC 300 TOTAL EFFORT 0.785 Person Months ============================================================================== PCNT EFFORT (PM) PCNT SCHEDULE Staff Plans And Requirements 7.000 0.055 16.178 1.171 0.047 Product Design 17.000 0.133 24.089 1.744 0.077 Programming 63.733 0.500 55.643 4.028 0.124 - Detailed Design 26.911 0.211 ---- ---- ---- - Code and Unit Test 36.822 0.289 ---- ---- ---- Integration and Test 19.267 0.151 20.267 1.467 0.103 ============================================================================== Life Cycle Phase Plans And Requirements Life Cycle Effort 0.055 Person Months Life Cycle Schedule 1.171 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Analysis 47.911 0.026 1.171 0.022 Product Design 16.045 0.009 1.171 0.008 Programming 2.589 0.001 1.171 0.001 Test Planning 2.545 0.001 1.171 0.001 Verification and Validation 6.045 0.003 1.171 0.003 Project Office 15.411 0.008 1.171 0.007 CM/QA 3.455 0.002 1.171 0.002 Manuals 6.000 0.003 1.171 0.003 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us MODULE PHASE & ACTIVITY INFORMATION (Waterfall) ================================================== ============================================================================== Life Cycle Phase Product Design Life Cycle Effort 0.133 Person Months Life Cycle Schedule 1.744 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Analysis 12.500 0.017 1.744 0.010 Product Design 41.000 0.055 1.744 0.031 Programming 12.045 0.016 1.744 0.009 Test Planning 4.545 0.006 1.744 0.003 Verification and Validation 6.045 0.008 1.744 0.005 Project Office 12.911 0.017 1.744 0.010 CM/QA 2.955 0.004 1.744 0.002 Manuals 8.000 0.011 1.744 0.006 ============================================================================== Life Cycle Phase Programming Life Cycle Effort 0.500 Person Months Life Cycle Schedule 4.028 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Analysis 4.000 0.020 4.028 0.005 Product Design 8.000 0.040 4.028 0.010 Programming 56.500 0.283 4.028 0.070 Test Planning 4.045 0.020 4.028 0.005 Verification and Validation 7.045 0.035 4.028 0.009 Project Office 7.455 0.037 4.028 0.009 CM/QA 6.955 0.035 4.028 0.009 Manuals 6.000 0.030 4.028 0.007 ============================================================================== Life Cycle Phase Integration and Test Life Cycle Effort 0.151 Person Months Life Cycle Schedule 1.467 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Analysis 2.500 0.004 1.467 0.003 Product Design 5.000 0.008 1.467 0.005 Programming 33.178 0.050 1.467 0.034 Test Planning 2.500 0.004 1.467 0.003 Verification and Validation 31.911 0.048 1.467 0.033 Project Office 8.455 0.013 1.467 0.009 CM/QA 8.455 0.013 1.467 0.009 Manuals 8.000 0.012 1.467 0.008 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us MODULE PHASE & ACTIVITY INFORMATION (MBASE) ================================================== Overall Phase Distribution ============================================================================== MODULE Interface to import SLOC 300 TOTAL EFFORT 0.785 Person Months ============================================================================== PCNT EFFORT (PM) PCNT SCHEDULE Staff Inception 6.000 0.047 12.500 0.905 0.052 Elaboration 24.000 0.188 37.500 2.715 0.069 Construction 76.000 0.597 62.500 4.524 0.132 Transition 12.000 0.094 12.500 0.905 0.104 ============================================================================== Life Cycle Phase Inception Life Cycle Effort 0.047 Person Months Life Cycle Schedule 0.905 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Capture 38.000 0.018 0.905 0.020 Analysis and Design 19.000 0.009 0.905 0.010 Implementation 8.000 0.004 0.905 0.004 Test 8.000 0.004 0.905 0.004 ============================================================================== Management 14.000 0.007 0.905 0.007 Environment 10.000 0.005 0.905 0.005 Deployment 3.000 0.001 0.905 0.002 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us MODULE PHASE & ACTIVITY INFORMATION (MBASE) ================================================== ============================================================================== Life Cycle Phase Elaboration Life Cycle Effort 0.188 Person Months Life Cycle Schedule 2.715 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Capture 18.000 0.034 2.715 0.012 Analysis and Design 36.000 0.068 2.715 0.025 Implementation 13.000 0.024 2.715 0.009 Test 10.000 0.019 2.715 0.007 ============================================================================== Management 12.000 0.023 2.715 0.008 Environment 8.000 0.015 2.715 0.006 Deployment 3.000 0.006 2.715 0.002 ============================================================================== Life Cycle Phase Construction Life Cycle Effort 0.597 Person Months Life Cycle Schedule 4.524 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Capture 8.000 0.048 4.524 0.011 Analysis and Design 16.000 0.095 4.524 0.021 Implementation 34.000 0.203 4.524 0.045 Test 24.000 0.143 4.524 0.032 ============================================================================== Management 10.000 0.060 4.524 0.013 Environment 5.000 0.030 4.524 0.007 Deployment 3.000 0.018 4.524 0.004 ============================================================================== Life Cycle Phase Transition Life Cycle Effort 0.094 Person Months Life Cycle Schedule 0.905 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Capture 4.000 0.004 0.905 0.004 Analysis and Design 4.000 0.004 0.905 0.004 Implementation 19.000 0.018 0.905 0.020 Test 24.000 0.023 0.905 0.025 ============================================================================== Management 14.000 0.013 0.905 0.015 Environment 5.000 0.005 0.905 0.005 Deployment 30.000 0.028 0.905 0.031 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us MODULE MAINTENANCE INFORMATION ============================================= MODULE Interface to import Development SLOC 300 Development Nominal Person-Month 0.94 Development Adjusted Person-Month 0.79 Development Cost 0.00 Maintenance Labor Rate 0.00 Percentage Added 0.00% Percentage Modified 0.00% Maintenance Software Understanding 30.00 Unfamiliarity with the Software 0.40 Change Traffic 0.00% Effort Ajustment Factor 1.00 + Product ++ Platform + RELY DATA DOCU CPLX RUSE TIME STOR PVOL Nominal Nominal Nominal Nominal Nominal Nominal Nominal Nominal 0% 0% 0% 0% 0% 0% 0% 0% + Personnel + ACAP APEX PCAP PLEX LTEX PCON Nominal Nominal Nominal Nominal Nominal Nominal 0% 0% 0% 0% 0% 0% + Project + User + TOOL SITE USR1 USR2 Nominal Nominal Nominal Nominal 0% 0% 0% 0% WORK LOAD PROJECTION FOR THE NEXT 1 YEARS Year KSLOC Effort_Nom Effort_Maint Staff KSLOC/Staff Cost 1 0.30 0.00 0.00 0.00 0.00 0.00 SUMMARY OF PROJECTION Cumulative Maintenance Person-month 0.00 Overall Development and Maintenance Person-month 0.79 Cumulative Maintenance Cost 0.00 Overall Development and Maintenance Cost 0.00 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us + Product ++ Platform + MODULE NAME RELY DATA DOCU CPLX RUSE TIME STOR PVOL N H N L L N H H SQLite Database 0% 0% 0% 0% 0% 0% 0% 0% 1.00 1.14 1.00 0.87 0.95 1.00 1.05 1.15 + Personnel ++ Project ++ User + MODULE NAME ACAP APEX PCAP PLEX LEXP PCON TOOL SCED SITE USR1 USR2 N N H L H L H N N N N SQLite Database 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 1.00 1.00 0.88 1.09 0.91 1.12 0.90 1.00 1.00 1.00 1.00 MODULE PHASE & ACTIVITY INFORMATION (Waterfall) ================================================== Overall Phase Distribution ============================================================================== MODULE SQLite Database SLOC 825 TOTAL EFFORT 2.576 Person Months ============================================================================== PCNT EFFORT (PM) PCNT SCHEDULE Staff Plans And Requirements 7.000 0.180 16.178 1.171 0.154 Product Design 17.000 0.438 24.089 1.744 0.251 Programming 63.733 1.642 55.643 4.028 0.408 - Detailed Design 26.911 0.693 ---- ---- ---- - Code and Unit Test 36.822 0.949 ---- ---- ---- Integration and Test 19.267 0.496 20.267 1.467 0.338 ============================================================================== Life Cycle Phase Plans And Requirements Life Cycle Effort 0.180 Person Months Life Cycle Schedule 1.171 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Analysis 47.911 0.086 1.171 0.074 Product Design 16.045 0.029 1.171 0.025 Programming 2.589 0.005 1.171 0.004 Test Planning 2.545 0.005 1.171 0.004 Verification and Validation 6.045 0.011 1.171 0.009 Project Office 15.411 0.028 1.171 0.024 CM/QA 3.455 0.006 1.171 0.005 Manuals 6.000 0.011 1.171 0.009 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us MODULE PHASE & ACTIVITY INFORMATION (Waterfall) ================================================== ============================================================================== Life Cycle Phase Product Design Life Cycle Effort 0.438 Person Months Life Cycle Schedule 1.744 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Analysis 12.500 0.055 1.744 0.031 Product Design 41.000 0.180 1.744 0.103 Programming 12.045 0.053 1.744 0.030 Test Planning 4.545 0.020 1.744 0.011 Verification and Validation 6.045 0.026 1.744 0.015 Project Office 12.911 0.057 1.744 0.032 CM/QA 2.955 0.013 1.744 0.007 Manuals 8.000 0.035 1.744 0.020 ============================================================================== Life Cycle Phase Programming Life Cycle Effort 1.642 Person Months Life Cycle Schedule 4.028 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Analysis 4.000 0.066 4.028 0.016 Product Design 8.000 0.131 4.028 0.033 Programming 56.500 0.928 4.028 0.230 Test Planning 4.045 0.066 4.028 0.016 Verification and Validation 7.045 0.116 4.028 0.029 Project Office 7.455 0.122 4.028 0.030 CM/QA 6.955 0.114 4.028 0.028 Manuals 6.000 0.099 4.028 0.024 ============================================================================== Life Cycle Phase Integration and Test Life Cycle Effort 0.496 Person Months Life Cycle Schedule 1.467 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Analysis 2.500 0.012 1.467 0.008 Product Design 5.000 0.025 1.467 0.017 Programming 33.178 0.165 1.467 0.112 Test Planning 2.500 0.012 1.467 0.008 Verification and Validation 31.911 0.158 1.467 0.108 Project Office 8.455 0.042 1.467 0.029 CM/QA 8.455 0.042 1.467 0.029 Manuals 8.000 0.040 1.467 0.027 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us MODULE PHASE & ACTIVITY INFORMATION (MBASE) ================================================== Overall Phase Distribution ============================================================================== MODULE SQLite Database SLOC 825 TOTAL EFFORT 2.576 Person Months ============================================================================== PCNT EFFORT (PM) PCNT SCHEDULE Staff Inception 6.000 0.155 12.500 0.905 0.171 Elaboration 24.000 0.618 37.500 2.715 0.228 Construction 76.000 1.958 62.500 4.524 0.433 Transition 12.000 0.309 12.500 0.905 0.342 ============================================================================== Life Cycle Phase Inception Life Cycle Effort 0.155 Person Months Life Cycle Schedule 0.905 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Capture 38.000 0.059 0.905 0.065 Analysis and Design 19.000 0.029 0.905 0.032 Implementation 8.000 0.012 0.905 0.014 Test 8.000 0.012 0.905 0.014 ============================================================================== Management 14.000 0.022 0.905 0.024 Environment 10.000 0.015 0.905 0.017 Deployment 3.000 0.005 0.905 0.005 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us MODULE PHASE & ACTIVITY INFORMATION (MBASE) ================================================== ============================================================================== Life Cycle Phase Elaboration Life Cycle Effort 0.618 Person Months Life Cycle Schedule 2.715 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Capture 18.000 0.111 2.715 0.041 Analysis and Design 36.000 0.223 2.715 0.082 Implementation 13.000 0.080 2.715 0.030 Test 10.000 0.062 2.715 0.023 ============================================================================== Management 12.000 0.074 2.715 0.027 Environment 8.000 0.049 2.715 0.018 Deployment 3.000 0.019 2.715 0.007 ============================================================================== Life Cycle Phase Construction Life Cycle Effort 1.958 Person Months Life Cycle Schedule 4.524 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Capture 8.000 0.157 4.524 0.035 Analysis and Design 16.000 0.313 4.524 0.069 Implementation 34.000 0.666 4.524 0.147 Test 24.000 0.470 4.524 0.104 ============================================================================== Management 10.000 0.196 4.524 0.043 Environment 5.000 0.098 4.524 0.022 Deployment 3.000 0.059 4.524 0.013 ============================================================================== Life Cycle Phase Transition Life Cycle Effort 0.309 Person Months Life Cycle Schedule 0.905 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Capture 4.000 0.012 0.905 0.014 Analysis and Design 4.000 0.012 0.905 0.014 Implementation 19.000 0.059 0.905 0.065 Test 24.000 0.074 0.905 0.082 ============================================================================== Management 14.000 0.043 0.905 0.048 Environment 5.000 0.015 0.905 0.017 Deployment 30.000 0.093 0.905 0.102 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us MODULE MAINTENANCE INFORMATION ============================================= MODULE SQLite Database Development SLOC 825 Development Nominal Person-Month 2.57 Development Adjusted Person-Month 2.58 Development Cost 0.00 Maintenance Labor Rate 0.00 Percentage Added 0.00% Percentage Modified 0.00% Maintenance Software Understanding 30.00 Unfamiliarity with the Software 0.40 Change Traffic 0.00% Effort Ajustment Factor 1.00 + Product ++ Platform + RELY DATA DOCU CPLX RUSE TIME STOR PVOL Nominal Nominal Nominal Nominal Nominal Nominal Nominal Nominal 0% 0% 0% 0% 0% 0% 0% 0% + Personnel + ACAP APEX PCAP PLEX LTEX PCON Nominal Nominal Nominal Nominal Nominal Nominal 0% 0% 0% 0% 0% 0% + Project + User + TOOL SITE USR1 USR2 Nominal Nominal Nominal Nominal 0% 0% 0% 0% WORK LOAD PROJECTION FOR THE NEXT 1 YEARS Year KSLOC Effort_Nom Effort_Maint Staff KSLOC/Staff Cost 1 0.82 0.00 0.00 0.00 0.00 0.00 SUMMARY OF PROJECTION Cumulative Maintenance Person-month 0.00 Overall Development and Maintenance Person-month 2.58 Cumulative Maintenance Cost 0.00 Overall Development and Maintenance Cost 0.00 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us + Product ++ Platform + MODULE NAME RELY DATA DOCU CPLX RUSE TIME STOR PVOL N H N N H N N H Log Analysis-relatio 0% 0% 0% 0% 0% 0% 0% 0% 1.00 1.14 1.00 1.00 1.07 1.00 1.00 1.15 + Personnel ++ Project ++ User + MODULE NAME ACAP APEX PCAP PLEX LEXP PCON TOOL SCED SITE USR1 USR2 N N H L H L H N N N N Log Analysis-relatio 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 1.00 1.00 0.88 1.09 0.91 1.12 0.90 1.00 1.00 1.00 1.00 MODULE PHASE & ACTIVITY INFORMATION (Waterfall) ================================================== Overall Phase Distribution ============================================================================== MODULE Log Analysis-relatio SLOC 400 TOTAL EFFORT 1.540 Person Months ============================================================================== PCNT EFFORT (PM) PCNT SCHEDULE Staff Plans And Requirements 7.000 0.108 16.178 1.171 0.092 Product Design 17.000 0.262 24.089 1.744 0.150 Programming 63.733 0.982 55.643 4.028 0.244 - Detailed Design 26.911 0.414 ---- ---- ---- - Code and Unit Test 36.822 0.567 ---- ---- ---- Integration and Test 19.267 0.297 20.267 1.467 0.202 ============================================================================== Life Cycle Phase Plans And Requirements Life Cycle Effort 0.108 Person Months Life Cycle Schedule 1.171 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Analysis 47.911 0.052 1.171 0.044 Product Design 16.045 0.017 1.171 0.015 Programming 2.589 0.003 1.171 0.002 Test Planning 2.545 0.003 1.171 0.002 Verification and Validation 6.045 0.007 1.171 0.006 Project Office 15.411 0.017 1.171 0.014 CM/QA 3.455 0.004 1.171 0.003 Manuals 6.000 0.006 1.171 0.006 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us MODULE PHASE & ACTIVITY INFORMATION (Waterfall) ================================================== ============================================================================== Life Cycle Phase Product Design Life Cycle Effort 0.262 Person Months Life Cycle Schedule 1.744 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Analysis 12.500 0.033 1.744 0.019 Product Design 41.000 0.107 1.744 0.062 Programming 12.045 0.032 1.744 0.018 Test Planning 4.545 0.012 1.744 0.007 Verification and Validation 6.045 0.016 1.744 0.009 Project Office 12.911 0.034 1.744 0.019 CM/QA 2.955 0.008 1.744 0.004 Manuals 8.000 0.021 1.744 0.012 ============================================================================== Life Cycle Phase Programming Life Cycle Effort 0.982 Person Months Life Cycle Schedule 4.028 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Analysis 4.000 0.039 4.028 0.010 Product Design 8.000 0.079 4.028 0.019 Programming 56.500 0.555 4.028 0.138 Test Planning 4.045 0.040 4.028 0.010 Verification and Validation 7.045 0.069 4.028 0.017 Project Office 7.455 0.073 4.028 0.018 CM/QA 6.955 0.068 4.028 0.017 Manuals 6.000 0.059 4.028 0.015 ============================================================================== Life Cycle Phase Integration and Test Life Cycle Effort 0.297 Person Months Life Cycle Schedule 1.467 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Analysis 2.500 0.007 1.467 0.005 Product Design 5.000 0.015 1.467 0.010 Programming 33.178 0.098 1.467 0.067 Test Planning 2.500 0.007 1.467 0.005 Verification and Validation 31.911 0.095 1.467 0.065 Project Office 8.455 0.025 1.467 0.017 CM/QA 8.455 0.025 1.467 0.017 Manuals 8.000 0.024 1.467 0.016 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us MODULE PHASE & ACTIVITY INFORMATION (MBASE) ================================================== Overall Phase Distribution ============================================================================== MODULE Log Analysis-relatio SLOC 400 TOTAL EFFORT 1.540 Person Months ============================================================================== PCNT EFFORT (PM) PCNT SCHEDULE Staff Inception 6.000 0.092 12.500 0.905 0.102 Elaboration 24.000 0.370 37.500 2.715 0.136 Construction 76.000 1.170 62.500 4.524 0.259 Transition 12.000 0.185 12.500 0.905 0.204 ============================================================================== Life Cycle Phase Inception Life Cycle Effort 0.092 Person Months Life Cycle Schedule 0.905 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Capture 38.000 0.035 0.905 0.039 Analysis and Design 19.000 0.018 0.905 0.019 Implementation 8.000 0.007 0.905 0.008 Test 8.000 0.007 0.905 0.008 ============================================================================== Management 14.000 0.013 0.905 0.014 Environment 10.000 0.009 0.905 0.010 Deployment 3.000 0.003 0.905 0.003 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us MODULE PHASE & ACTIVITY INFORMATION (MBASE) ================================================== ============================================================================== Life Cycle Phase Elaboration Life Cycle Effort 0.370 Person Months Life Cycle Schedule 2.715 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Capture 18.000 0.067 2.715 0.025 Analysis and Design 36.000 0.133 2.715 0.049 Implementation 13.000 0.048 2.715 0.018 Test 10.000 0.037 2.715 0.014 ============================================================================== Management 12.000 0.044 2.715 0.016 Environment 8.000 0.030 2.715 0.011 Deployment 3.000 0.011 2.715 0.004 ============================================================================== Life Cycle Phase Construction Life Cycle Effort 1.170 Person Months Life Cycle Schedule 4.524 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Capture 8.000 0.094 4.524 0.021 Analysis and Design 16.000 0.187 4.524 0.041 Implementation 34.000 0.398 4.524 0.088 Test 24.000 0.281 4.524 0.062 ============================================================================== Management 10.000 0.117 4.524 0.026 Environment 5.000 0.059 4.524 0.013 Deployment 3.000 0.035 4.524 0.008 ============================================================================== Life Cycle Phase Transition Life Cycle Effort 0.185 Person Months Life Cycle Schedule 0.905 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Capture 4.000 0.007 0.905 0.008 Analysis and Design 4.000 0.007 0.905 0.008 Implementation 19.000 0.035 0.905 0.039 Test 24.000 0.044 0.905 0.049 ============================================================================== Management 14.000 0.026 0.905 0.029 Environment 5.000 0.009 0.905 0.010 Deployment 30.000 0.055 0.905 0.061 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us MODULE MAINTENANCE INFORMATION ============================================= MODULE Log Analysis-relatio Development SLOC 400 Development Nominal Person-Month 1.25 Development Adjusted Person-Month 1.54 Development Cost 0.00 Maintenance Labor Rate 0.00 Percentage Added 0.00% Percentage Modified 0.00% Maintenance Software Understanding 30.00 Unfamiliarity with the Software 0.40 Change Traffic 0.00% Effort Ajustment Factor 1.00 + Product ++ Platform + RELY DATA DOCU CPLX RUSE TIME STOR PVOL Nominal Nominal Nominal Nominal Nominal Nominal Nominal Nominal 0% 0% 0% 0% 0% 0% 0% 0% + Personnel + ACAP APEX PCAP PLEX LTEX PCON Nominal Nominal Nominal Nominal Nominal Nominal 0% 0% 0% 0% 0% 0% + Project + User + TOOL SITE USR1 USR2 Nominal Nominal Nominal Nominal 0% 0% 0% 0% WORK LOAD PROJECTION FOR THE NEXT 1 YEARS Year KSLOC Effort_Nom Effort_Maint Staff KSLOC/Staff Cost 1 0.40 0.00 0.00 0.00 0.00 0.00 SUMMARY OF PROJECTION Cumulative Maintenance Person-month 0.00 Overall Development and Maintenance Person-month 1.54 Cumulative Maintenance Cost 0.00 Overall Development and Maintenance Cost 0.00 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us + Product ++ Platform + MODULE NAME RELY DATA DOCU CPLX RUSE TIME STOR PVOL N H N N N N N H Log Analysis-structu 0% 0% 0% 0% 0% 0% 0% 0% 1.00 1.14 1.00 1.00 1.00 1.00 1.00 1.15 + Personnel ++ Project ++ User + MODULE NAME ACAP APEX PCAP PLEX LEXP PCON TOOL SCED SITE USR1 USR2 N L H L H L H N N N N Log Analysis-structu 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 1.00 1.10 0.88 1.09 0.91 1.12 0.90 1.00 1.00 1.00 1.00 MODULE PHASE & ACTIVITY INFORMATION (Waterfall) ================================================== Overall Phase Distribution ============================================================================== MODULE Log Analysis-structu SLOC 500 TOTAL EFFORT 1.979 Person Months ============================================================================== PCNT EFFORT (PM) PCNT SCHEDULE Staff Plans And Requirements 7.000 0.139 16.178 1.171 0.118 Product Design 17.000 0.336 24.089 1.744 0.193 Programming 63.733 1.261 55.643 4.028 0.313 - Detailed Design 26.911 0.533 ---- ---- ---- - Code and Unit Test 36.822 0.729 ---- ---- ---- Integration and Test 19.267 0.381 20.267 1.467 0.260 ============================================================================== Life Cycle Phase Plans And Requirements Life Cycle Effort 0.139 Person Months Life Cycle Schedule 1.171 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Analysis 47.911 0.066 1.171 0.057 Product Design 16.045 0.022 1.171 0.019 Programming 2.589 0.004 1.171 0.003 Test Planning 2.545 0.004 1.171 0.003 Verification and Validation 6.045 0.008 1.171 0.007 Project Office 15.411 0.021 1.171 0.018 CM/QA 3.455 0.005 1.171 0.004 Manuals 6.000 0.008 1.171 0.007 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us MODULE PHASE & ACTIVITY INFORMATION (Waterfall) ================================================== ============================================================================== Life Cycle Phase Product Design Life Cycle Effort 0.336 Person Months Life Cycle Schedule 1.744 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Analysis 12.500 0.042 1.744 0.024 Product Design 41.000 0.138 1.744 0.079 Programming 12.045 0.041 1.744 0.023 Test Planning 4.545 0.015 1.744 0.009 Verification and Validation 6.045 0.020 1.744 0.012 Project Office 12.911 0.043 1.744 0.025 CM/QA 2.955 0.010 1.744 0.006 Manuals 8.000 0.027 1.744 0.015 ============================================================================== Life Cycle Phase Programming Life Cycle Effort 1.261 Person Months Life Cycle Schedule 4.028 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Analysis 4.000 0.050 4.028 0.013 Product Design 8.000 0.101 4.028 0.025 Programming 56.500 0.713 4.028 0.177 Test Planning 4.045 0.051 4.028 0.013 Verification and Validation 7.045 0.089 4.028 0.022 Project Office 7.455 0.094 4.028 0.023 CM/QA 6.955 0.088 4.028 0.022 Manuals 6.000 0.076 4.028 0.019 ============================================================================== Life Cycle Phase Integration and Test Life Cycle Effort 0.381 Person Months Life Cycle Schedule 1.467 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Analysis 2.500 0.010 1.467 0.006 Product Design 5.000 0.019 1.467 0.013 Programming 33.178 0.127 1.467 0.086 Test Planning 2.500 0.010 1.467 0.006 Verification and Validation 31.911 0.122 1.467 0.083 Project Office 8.455 0.032 1.467 0.022 CM/QA 8.455 0.032 1.467 0.022 Manuals 8.000 0.031 1.467 0.021 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us MODULE PHASE & ACTIVITY INFORMATION (MBASE) ================================================== Overall Phase Distribution ============================================================================== MODULE Log Analysis-structu SLOC 500 TOTAL EFFORT 1.979 Person Months ============================================================================== PCNT EFFORT (PM) PCNT SCHEDULE Staff Inception 6.000 0.119 12.500 0.905 0.131 Elaboration 24.000 0.475 37.500 2.715 0.175 Construction 76.000 1.504 62.500 4.524 0.332 Transition 12.000 0.237 12.500 0.905 0.262 ============================================================================== Life Cycle Phase Inception Life Cycle Effort 0.119 Person Months Life Cycle Schedule 0.905 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Capture 38.000 0.045 0.905 0.050 Analysis and Design 19.000 0.023 0.905 0.025 Implementation 8.000 0.009 0.905 0.010 Test 8.000 0.009 0.905 0.010 ============================================================================== Management 14.000 0.017 0.905 0.018 Environment 10.000 0.012 0.905 0.013 Deployment 3.000 0.004 0.905 0.004 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us MODULE PHASE & ACTIVITY INFORMATION (MBASE) ================================================== ============================================================================== Life Cycle Phase Elaboration Life Cycle Effort 0.475 Person Months Life Cycle Schedule 2.715 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Capture 18.000 0.085 2.715 0.031 Analysis and Design 36.000 0.171 2.715 0.063 Implementation 13.000 0.062 2.715 0.023 Test 10.000 0.047 2.715 0.017 ============================================================================== Management 12.000 0.057 2.715 0.021 Environment 8.000 0.038 2.715 0.014 Deployment 3.000 0.014 2.715 0.005 ============================================================================== Life Cycle Phase Construction Life Cycle Effort 1.504 Person Months Life Cycle Schedule 4.524 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Capture 8.000 0.120 4.524 0.027 Analysis and Design 16.000 0.241 4.524 0.053 Implementation 34.000 0.511 4.524 0.113 Test 24.000 0.361 4.524 0.080 ============================================================================== Management 10.000 0.150 4.524 0.033 Environment 5.000 0.075 4.524 0.017 Deployment 3.000 0.045 4.524 0.010 ============================================================================== Life Cycle Phase Transition Life Cycle Effort 0.237 Person Months Life Cycle Schedule 0.905 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Capture 4.000 0.009 0.905 0.010 Analysis and Design 4.000 0.009 0.905 0.010 Implementation 19.000 0.045 0.905 0.050 Test 24.000 0.057 0.905 0.063 ============================================================================== Management 14.000 0.033 0.905 0.037 Environment 5.000 0.012 0.905 0.013 Deployment 30.000 0.071 0.905 0.079 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us MODULE MAINTENANCE INFORMATION ============================================= MODULE Log Analysis-structu Development SLOC 500 Development Nominal Person-Month 1.56 Development Adjusted Person-Month 1.98 Development Cost 0.00 Maintenance Labor Rate 0.00 Percentage Added 0.00% Percentage Modified 0.00% Maintenance Software Understanding 30.00 Unfamiliarity with the Software 0.40 Change Traffic 0.00% Effort Ajustment Factor 1.00 + Product ++ Platform + RELY DATA DOCU CPLX RUSE TIME STOR PVOL Nominal Nominal Nominal Nominal Nominal Nominal Nominal Nominal 0% 0% 0% 0% 0% 0% 0% 0% + Personnel + ACAP APEX PCAP PLEX LTEX PCON Nominal Nominal Nominal Nominal Nominal Nominal 0% 0% 0% 0% 0% 0% + Project + User + TOOL SITE USR1 USR2 Nominal Nominal Nominal Nominal 0% 0% 0% 0% WORK LOAD PROJECTION FOR THE NEXT 1 YEARS Year KSLOC Effort_Nom Effort_Maint Staff KSLOC/Staff Cost 1 0.50 0.00 0.00 0.00 0.00 0.00 SUMMARY OF PROJECTION Cumulative Maintenance Person-month 0.00 Overall Development and Maintenance Person-month 1.98 Cumulative Maintenance Cost 0.00 Overall Development and Maintenance Cost 0.00 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us + Product ++ Platform + MODULE NAME RELY DATA DOCU CPLX RUSE TIME STOR PVOL N H N N N N N H Visualization of log 0% 0% 0% 0% 0% 0% 0% 0% 1.00 1.14 1.00 1.00 1.00 1.00 1.00 1.15 + Personnel ++ Project ++ User + MODULE NAME ACAP APEX PCAP PLEX LEXP PCON TOOL SCED SITE USR1 USR2 N L H L H L H N N N N Visualization of log 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 0% 1.00 1.10 0.88 1.09 0.91 1.12 0.90 1.00 1.00 1.00 1.00 MODULE PHASE & ACTIVITY INFORMATION (Waterfall) ================================================== Overall Phase Distribution ============================================================================== MODULE Visualization of log SLOC 510 TOTAL EFFORT 2.019 Person Months ============================================================================== PCNT EFFORT (PM) PCNT SCHEDULE Staff Plans And Requirements 7.000 0.141 16.178 1.171 0.121 Product Design 17.000 0.343 24.089 1.744 0.197 Programming 63.733 1.287 55.643 4.028 0.319 - Detailed Design 26.911 0.543 ---- ---- ---- - Code and Unit Test 36.822 0.743 ---- ---- ---- Integration and Test 19.267 0.389 20.267 1.467 0.265 ============================================================================== Life Cycle Phase Plans And Requirements Life Cycle Effort 0.141 Person Months Life Cycle Schedule 1.171 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Analysis 47.911 0.068 1.171 0.058 Product Design 16.045 0.023 1.171 0.019 Programming 2.589 0.004 1.171 0.003 Test Planning 2.545 0.004 1.171 0.003 Verification and Validation 6.045 0.009 1.171 0.007 Project Office 15.411 0.022 1.171 0.019 CM/QA 3.455 0.005 1.171 0.004 Manuals 6.000 0.008 1.171 0.007 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us MODULE PHASE & ACTIVITY INFORMATION (Waterfall) ================================================== ============================================================================== Life Cycle Phase Product Design Life Cycle Effort 0.343 Person Months Life Cycle Schedule 1.744 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Analysis 12.500 0.043 1.744 0.025 Product Design 41.000 0.141 1.744 0.081 Programming 12.045 0.041 1.744 0.024 Test Planning 4.545 0.016 1.744 0.009 Verification and Validation 6.045 0.021 1.744 0.012 Project Office 12.911 0.044 1.744 0.025 CM/QA 2.955 0.010 1.744 0.006 Manuals 8.000 0.027 1.744 0.016 ============================================================================== Life Cycle Phase Programming Life Cycle Effort 1.287 Person Months Life Cycle Schedule 4.028 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Analysis 4.000 0.051 4.028 0.013 Product Design 8.000 0.103 4.028 0.026 Programming 56.500 0.727 4.028 0.180 Test Planning 4.045 0.052 4.028 0.013 Verification and Validation 7.045 0.091 4.028 0.023 Project Office 7.455 0.096 4.028 0.024 CM/QA 6.955 0.089 4.028 0.022 Manuals 6.000 0.077 4.028 0.019 ============================================================================== Life Cycle Phase Integration and Test Life Cycle Effort 0.389 Person Months Life Cycle Schedule 1.467 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Analysis 2.500 0.010 1.467 0.007 Product Design 5.000 0.019 1.467 0.013 Programming 33.178 0.129 1.467 0.088 Test Planning 2.500 0.010 1.467 0.007 Verification and Validation 31.911 0.124 1.467 0.085 Project Office 8.455 0.033 1.467 0.022 CM/QA 8.455 0.033 1.467 0.022 Manuals 8.000 0.031 1.467 0.021 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us MODULE PHASE & ACTIVITY INFORMATION (MBASE) ================================================== Overall Phase Distribution ============================================================================== MODULE Visualization of log SLOC 510 TOTAL EFFORT 2.019 Person Months ============================================================================== PCNT EFFORT (PM) PCNT SCHEDULE Staff Inception 6.000 0.121 12.500 0.905 0.134 Elaboration 24.000 0.484 37.500 2.715 0.178 Construction 76.000 1.534 62.500 4.524 0.339 Transition 12.000 0.242 12.500 0.905 0.268 ============================================================================== Life Cycle Phase Inception Life Cycle Effort 0.121 Person Months Life Cycle Schedule 0.905 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Capture 38.000 0.046 0.905 0.051 Analysis and Design 19.000 0.023 0.905 0.025 Implementation 8.000 0.010 0.905 0.011 Test 8.000 0.010 0.905 0.011 ============================================================================== Management 14.000 0.017 0.905 0.019 Environment 10.000 0.012 0.905 0.013 Deployment 3.000 0.004 0.905 0.004 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us MODULE PHASE & ACTIVITY INFORMATION (MBASE) ================================================== ============================================================================== Life Cycle Phase Elaboration Life Cycle Effort 0.484 Person Months Life Cycle Schedule 2.715 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Capture 18.000 0.087 2.715 0.032 Analysis and Design 36.000 0.174 2.715 0.064 Implementation 13.000 0.063 2.715 0.023 Test 10.000 0.048 2.715 0.018 ============================================================================== Management 12.000 0.058 2.715 0.021 Environment 8.000 0.039 2.715 0.014 Deployment 3.000 0.015 2.715 0.005 ============================================================================== Life Cycle Phase Construction Life Cycle Effort 1.534 Person Months Life Cycle Schedule 4.524 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Capture 8.000 0.123 4.524 0.027 Analysis and Design 16.000 0.245 4.524 0.054 Implementation 34.000 0.522 4.524 0.115 Test 24.000 0.368 4.524 0.081 ============================================================================== Management 10.000 0.153 4.524 0.034 Environment 5.000 0.077 4.524 0.017 Deployment 3.000 0.046 4.524 0.010 ============================================================================== Life Cycle Phase Transition Life Cycle Effort 0.242 Person Months Life Cycle Schedule 0.905 Months ============================================================================== PCNT EFFORT (PM) SCHEDULE Staff Requirements Capture 4.000 0.010 0.905 0.011 Analysis and Design 4.000 0.010 0.905 0.011 Implementation 19.000 0.046 0.905 0.051 Test 24.000 0.058 0.905 0.064 ============================================================================== Management 14.000 0.034 0.905 0.037 Environment 5.000 0.012 0.905 0.013 Deployment 30.000 0.073 0.905 0.080 Printed at: Wed May 04 23:22:31 2005 Project Name: Data Mining of DL Us MODULE MAINTENANCE INFORMATION ============================================= MODULE Visualization of log Development SLOC 510 Development Nominal Person-Month 1.59 Development Adjusted Person-Month 2.02 Development Cost 0.00 Maintenance Labor Rate 0.00 Percentage Added 0.00% Percentage Modified 0.00% Maintenance Software Understanding 30.00 Unfamiliarity with the Software 0.40 Change Traffic 0.00% Effort Ajustment Factor 1.00 + Product ++ Platform + RELY DATA DOCU CPLX RUSE TIME STOR PVOL Nominal Nominal Nominal Nominal Nominal Nominal Nominal Nominal 0% 0% 0% 0% 0% 0% 0% 0% + Personnel + ACAP APEX PCAP PLEX LTEX PCON Nominal Nominal Nominal Nominal Nominal Nominal 0% 0% 0% 0% 0% 0% + Project + User + TOOL SITE USR1 USR2 Nominal Nominal Nominal Nominal 0% 0% 0% 0% WORK LOAD PROJECTION FOR THE NEXT 1 YEARS Year KSLOC Effort_Nom Effort_Maint Staff KSLOC/Staff Cost 1 0.51 0.00 0.00 0.00 0.00 0.00 SUMMARY OF PROJECTION Cumulative Maintenance Person-month 0.00 Overall Development and Maintenance Person-month 2.02 Cumulative Maintenance Cost 0.00 Overall Development and Maintenance Cost 0.00