As-Built Package

Due Date: April 29, 2021 11:59 pm
How to Submit: on your team website under "Final Deliverables" or "FD"
Submission File Naming Convention: (DOCNAME)_AsBuilt_S21b_TXX.docx or .pdf

Instructions:

Update the following documents to reflect the recent changes in your project. Please incorporate feedback you received from your RDCR Package and design code review session (for SSAD).

  • TPC (Test Case plan)
  • LCP (Life Cycle Plan)
  • FED (Feasibility Evidence Document)
  • OCD (Operational Concept Description)
  • SSAD (Structured Systems Analysis and Design)
  • WC (Win conditions)

In addition, your team should submit the following documents:

  • TP (Transition Plan)
  • SP (Support Plan)
  • UM (User Manual) – no exact format/template for this document.
  • TM (Technical Manual) – no exact format/template for this document.

Please incorporate feedback you received from your ARB presentation. You are also free to tailor the document to better fit your project; however, any changes to the template need to be justified.

Each document should have the following naming convention: (DOCNAME)_AsBuilt_S21b_Txx_Vxx.docx and .pdf

Where Txx is your team number (e.g., T01, T02, T06). Vxx is the document version number (e.g., V1.1 and V2.0).